Now that our little sprinkler valve plumbing project is wrapping up it's time to make the electric work.  The area with the valves is becoming the garden work area, the garden shed is being moved, and a workbench will be placed, so we need power and light.

Two lights, one controlled via three-way switches, power to the sprinkler controller, power to the shed, and 24VAC from the controller to the valves...

Got the 3/4" conduit and the boxes for it done, except the in-ground stuff to the sprinkler valve boxes.  Still have to do the half inch stuff and the boxes for it, and obviously pulling wire, plus the little thing of pouring a foundation and moving the shed...